This scheme was the re-ordering of the West end of the church, to form an organ gallery, with an equal access WC, servery and meeting room underneath. The structure was a steel frame encased within partitions and floor to take the weight of the organ when it is installed. The walls were insulated to produce a warm and sound proof room from the remainder of the church and heating was installed to ensure year long use. The organ is anticipated to be installed in 2012.

All operations are continuing in accordance with COVID-19 guidelines, this includes accepting new architectural and surveying enquiries.