Orange Triangle

SS Peter & Paul, Kedington

St Peter and Paul, an important medieval church, required modern facilities to include a WC and servery.

Project Overview

Preliminary studies showed that only the existing semi-circular gallery at the West end of the church in front of the tower was suitable for the facilities. A timber framed structure was formed with paneling to match that of the existing gallery and reflect the existing curve.

The accommodation created from this was an equal access WC, servery and storage cupboard. Further decoration work was undertaken in the existing vestry behind the gallery. The plumbing was fitted into the existing redundant heating ducts and a trench arch drain was constructed in the churchyard, with archaeological oversight.

Recent Projects

Outbuilding Conversion

Housing Architecture

Outbuilding Conversion

In 2023, Whitworth were approach by our client to sympathetically carry out the conversion of an existing 1980s garage, originally built to accommodate the previous owner’s Ferrari, to a new one-bedroom annexe accommodation.

Martello Tower

Conservation Architecture

Martello Tower

Whitworth oversaw the restoration of the historic Martello Tower in Aldeburgh, the largest of its kind from the Napoleonic Wars.

Brick Barn, Conversion, Essex

Conservation Architecture

Brick Barn, Conversion, Essex

Discover how this Grade II Listed brick barn was transformed into a stunning contemporary home while preserving its history. Featuring an open-plan living-kitchen space, a sleek glazed link to a new living room extension, and a carefully engineered cantilever staircase, the design blends modern style with original features.

To top